Engagement Hub

Mixed Use Development

Applicant

PJ’s Employment Pty Limited

Address

27-33 Everton Road, Strathfield NSW 2135

Description

Concurrent State Significant Development Application SSD-98684458 and Rezoning Application for a proposed mixed use development retaining and refurbishing the heritage listed Strathfield Hotel and upgraded accommodation, and constructing residential apartments and affordable housing.

Objective

Retain and Upgrade heritage-listed Whelan’s Strathfield Hotel.
Provide additional housing in a highly accessible metropolitan Sydney location.

Details

This is a concurrent State Significant Development Application (SSDA) and Rezoning Application for a proposed mixed use development.

State Significant Development Application

The Applicant submitted an Expression of Interest (EOI) for the Project to the Housing Development Authority (HDA).  


The proposal was declared SSD under State Significant Development Declaration Order (No. 11) 2025 on 23 July 2025, as modified by State Significant Development Order (No. 15) 2025 on 21 October 2025 for “development for the purpose of shop top housing and retention and restoration of heritage item with provision of affordable housing”.


The Project seeks to deliver a new mixed use 30 storey building in the Strathfield Town Centre that includes the retention of the heritage listed Strathfield Hotel at its current location, and the construction of new residential tower with basement parking at the rear of the Hotel.


At this stage, the proposed development is anticipated to involve the following: 

  • Internal and external alterations and additions to the
    Strathfield Hotel at Ground Level (~966sqm); including
    refurbished hotel accommodation at Levels 1 and 2
    (~800sqm);

  • Residential lobby accessed from Everton Road and back-of-
    house facilities within a Ground Floor podium to Cowdery
    Lane, vehicle access off Cowdery Lane;
  • Construction of shop top housing over the northern part of
    the site at Levels 2 to 29, comprising some 162 residential
    units (~15,500sqm) with a variety of dwelling types to meet
    a range of needs.
  • Provision of 5% affordable housing;
  • Total floorspace of ~17,295sqm GFA; and
  • Excavation of six (6) levels of basement parking for
  • approximately 216 parking spaces and one mezzanine level
    (approximately 20 spaces) servicing hotel, residential and
    visitors;
  • Landscaping to provide communal and private open space
    on the podium; and

  • Associated utility and stormwater connections.

State Significant Development Application

The rezoning application will be lodged concurrently with the State Significant Development for the redevelopment.

To support the proposal as detailed above, it is necessary to amend select planning controls that apply to the site under Burwood Local Environmental Plan 2012 (the LEP).  


The amendments to the Height and Floor Space Ratio controls will enable the delivery of additional housing that meets broader planning objectives. 

  Existing Controls (Burwood LEP 2012) Rezoning Proposal
Zoning MU1 Mixed Use No change
Height of Building 30m 97m (rooftop parapet), 101.5m (lift overrun)
Floor Space Ratio 3:1 9:1
Floor Space Ratio Special Provision Special provision – Area 4 (maximum residential accommodation – 2.3:1) Remove special provision

Plans

Next Steps

Elements are still being refined in the background as we continue to work on the Project. 

The Application is anticipated to be lodged with the Department by August 2026. Once lodged, all documents will be placed on public exhibition and there will be another opportunity for you to review all files and share your feedback. 


We value your involvement throughout this process, and your insights will help shape the proposal as it continues to evolve. To provide your timely feedback, please respond no later than 20 March 2026.  

Make a Submission

"*" indicates required fields

Drop files here or
Accepted file types: pdf, doc, docx, jpg, jpeg, png, Max. file size: 5 MB.